Explanatory video about the rules for external construction work [Part 2] (English)

Information

This video explains the rules that must be observed when performing external construction work on the premises of Toyota Boshoku Corporation.

Please use this during morning meetings and toolbox meetings.

*Each link will open in a new tab.

Work at height : Openings

All Segmented Version
01 Safety equipment
02 How to place materials
03 Fall prevention measures
04 Measures to be take when handrails, etc. are removed
05 Ensuring safe lighting

Work at height : High-place work vehicle, boom type

All Segmented Version
01 Required qualifications
02 Pre-work inspection
03 Fall arrest measures
04 Fall prevention measures
05 Measures to take when leaving the driver’s seat
06 Measures under extra-high power transmission lines

Asbestos handling work

All Segmented Version
01 Necessary bulletin board
02 How to remove asbestos-containing molded boards
03 How to remove asbestos-containing calcium silicate boards
04 How to remove asbestos-containing finishing coating materials
05 Protective equipment
06 Record of work implementation status using photographs, etc.
07 Storage method for industrial waste containing asbestos

Painting work

All Segmented Version
01 3 major signboard displays
02 Ventilation
03 Check surroundings
04 Protective equipment
05 Container management

Heavy machinery work : Crane truck

All Segmented Version
01 Checking the ground conditions
02 Use of floorboards
03 About outriggers
04 Points to note when performing slinging work
05 Operator position when cutting ground, etc.
06 No-trespassing measures
07 Measures to be taken in bad weather
08 Measures to take when leaving the driver’s seat
09 Measures when traveling
10 Measures taken directly beneath extra-high voltage power lines

Heavy machinery work : Truck

All Segmented Version
01 Safety education qualification
02 Guidance and trespassing measures
03 Inspection of vehicles and cargo
04 Equipment and protective equipment when ascending and descending
05 Wheel chocks when parking

Heavy machinery work : Vehicle-based construction machinery

All Segmented Version
01 Safety education qualification
02 Entry prohibition measures and guides
03 Measures during loading and unloading
04 Removing and attaching attachments
05 Measures to take when leaving the driver’s seat

Heavy machinery work : Forklift

All Segmented Version
01 How to drive
02 Check for cargo collapse
03 Measures to take when leaving the driver’s seat
04 Prohibitions

Lockout work : General

All Segmented Version
01 Checking the lock
02 Checking the stop range
03 Locking
04 Confirmation after work is completed

Lockout work : Control panel

All Segmented Version
01 Voltage check/lockout
02 Measures to be taken if all power cannot be turned off
03 Measures for mixed work
04 Measures during trial operation

Lockout work : Lockout of multi-person and equipment

All Segmented Version
01 Lockout locking points
02 How to operate the lock
03 Lock management

Handling and transporting heavy objects

All Segmented Version
01 Checking the lifting gear and checking the center of gravity
02 Measures when lifting
03 Operating position
04 Securing heavy objects

Work using vibrating tools(chipping, etc.)

All Segmented Version
01 Handling of vibrating tools
02 Protective equipment
03 Environmental conservation