Explanatory video about the rules for external construction work

Information

This video explains the rules that must be observed when performing external construction work on the premises of Toyota Boshoku Corporation.

Please use this during morning meetings and toolbox meetings.

Contents List

Part1

01 Construction Manager
02 Person in charge of work
03 Mixed work
04 Electrical work
05 Chemical substance handling work
06 Hot work : General
07 Hot work : Grinder
08 Hot work : Arc welding/cutting
09 Dangerous work involving oxygen deficiency, hydrogen sulfide, and gas vapor
10 Work at height : General
11 Work at height : Scaffolding
12 Work at height : Working on the roof
13 Work at height : Ladder
14 Work at height : Stepladder

Part 2

15 Work at height : Openings
16 Work at height : High-place work vehicle, boom type
17 Asbestos handling work
18 Painting work
19 Heavy machinery work : Crane truck
20 Heavy machinery work : Truck
21 Heavy machinery work : Vehicle-based construction machinery
22 Heavy machinery work : Forklift
23 Lockout work : General
24 Lockout work : Control panel
25 Lockout work : Lockout of multi-person and equipment
26 Handling and transporting heavy objects
27 Work using vibrating tools(chipping, etc.)